亚洲日韩欧美另类蜜桃在线观看,中字幕一区二区三区视频播放_亚洲精品AⅤ无码产一区二区免费看_无码秘人妻一区二区三区_国产品无码一区二区三区在线_九九精品视频一区二区三区

  • <sup id="gosve"></sup>

    <dfn id="gosve"></dfn>
    <pre id="gosve"></pre>

    <sup id="gosve"></sup>
      <pre id="gosve"></pre>
      <sup id="gosve"></sup>
      <object id="gosve"></object><sup id="gosve"></sup>

        <dfn id="gosve"></dfn>
        <pre id="gosve"></pre>

        <sup id="gosve"></sup>
      1. <dfn id="gosve"></dfn>

      2. <sup id="gosve"></sup>

          <pre id="gosve"></pre>

            <sup id="gosve"></sup>
              1. <menuitem id="gosve"></menuitem>
                <object id="gosve"></object>

                <dfn id="gosve"></dfn>
                <sup id="gosve"></sup>
                <object id="gosve"></object>
                      1. <dfn id="gosve"></dfn>
                        <pre id="gosve"></pre>
                          1. <object id="gosve"></object>

                            1. Welcome to ZHEJIANG HUANCHOU MECHANICAL EQUIPMENT MANUFACTURING CO., LTD web site!
                              Sitemap?。?a href="/En/contact">Contact
                              Logo
                              Email:sales01@zj-huanchou.com
                              TEL/WHATSAPP/WECHAT:+86 15268661048
                                            +86 15257952553

                              TEL/WHATSAPP/WECHAT:
                              +86 15268661048

                              Hot keywords:Three dimensional transparent film packaging machine | vertical food packaging
                              Email:sales01@zj-huanchou.com
                              TEL/WHATSAPP/WECHAT:+8615268661048

                              Common problemAbout Us

                              Home >Common problem

                              Maintenance plan of automatic injector assembly machine
                              發(fā)布:admin 瀏覽:5252次

                              First, daily maintenance

                              1. check the power supply and electric control switch, knob is safe and reliable, to work in all parts of the inspection, there is no abnormal phenomenon and sound, complete equipment inspection card; 2. should maintain complete equipment, lines, gas path intact;

                              3. to ensure that all parts of the equipment running flexibly;

                              4. check the equipment inspection system regularly to ensure the normal operation of the equipment,

                              5. after the end of the daily use of equipment, after the power cleared in time, there is no debris on the rotating disk, so as not to start the machine when rotating into the device, the occurrence of stuck phenomenon.

                              Two. Monthly maintenance

                              1. check whether the power supply and electrical control switch, twist and so on are safe and reliable, and whether there is any abnormal phenomenon and sound in each part,

                              2. lines, gas road integrity, spare parts without defects,

                              3. inside and outside the equipment clean, no dust, no drop products,

                              4. drive gear coated with grease lubrication, sliding bearing plus lubricating oil.

                              Three. Annual maintenance


                              1. check whether the electrical connectors in electrical cabinet are loose or not,

                              2. power supply, the power supply voltage of the test equipment is in line with the provisions,

                              3. inside and outside the equipment clean, no dust, no drop products,

                              4. replace the retarder oil,

                              5. drive gears coated with grease lubrication,

                              6. pass test to check whether the operation of the operating mechanism is normal or not,

                              After 7. maintenance, the handle should be placed in the non working position, the electrical control switch, twist, etc. revert to "0" position, cut off the power supply.

                              8. fill in the equipment annual maintenance plan.